Level 1
- Daily mileage is modest
- Long overnight dwell time is available
- A suitable dedicated outlet is confirmed
Start with daily miles and overnight dwell time before paying for maximum charging power.
| Decision | Level 1 | Level 2 |
|---|---|---|
| Supply | 120V outlet | Dedicated 240V circuit |
| Charging pace | Lower | Higher |
| Electrical work | May use a suitable existing circuit | Load calculation, circuit and permit commonly required |
| Best sizing input | Daily energy needed | Vehicle, dwell time and service capacity |
| Quote focus | Outlet and circuit condition | Amperage, wiring route and load management |
No. Equipment, existing infrastructure, local labor, permits, financing and operating cost must be compared with the same home assumptions.
Give bidders the same home data and require itemized equipment, labor, electrical or fuel work, permits, commissioning, exclusions and warranties.