Storage tank
- Simple like-for-like replacement is possible
- High simultaneous demand needs stored capacity
- Lower installation complexity is preferred
Compare peak hot-water demand, fuel and venting, installation changes, maintenance and delivered capacity.
| Decision | Storage tank | Tankless |
|---|---|---|
| Capacity basis | Tank volume + first-hour rating | Flow rate at temperature rise |
| Space | Tank footprint | Wall-mounted footprint |
| Fuel / power | Gas or electric | Often gas; electric models need substantial capacity |
| Maintenance | Tank flushing and anode checks | Scale management and flushing |
| Quote focus | Drainage, venting, connections | Gas/electrical upgrades and venting |
No. Equipment, existing infrastructure, local labor, permits, financing and operating cost must be compared with the same home assumptions.
Give bidders the same home data and require itemized equipment, labor, electrical or fuel work, permits, commissioning, exclusions and warranties.